City Plaza: Misting and Cooling

Anonymous case study Commercial Dongguan

Anonymised at the client's request: no client name, logo or identifying detail is shown.

Background

The plaza sits between two buildings, so paving and glass store heat all afternoon. Fans only moved warm air, and hosing down created slip hazards the property team would not accept.

Configuration

Nozzles on posts along both sides, split into three zones; host and cabinet in the plant room with the main line above the ceiling. Intermittent operation rotates zones in the afternoon.

Delivery notes

Three implementation notes: nozzles high enough for droplets to evaporate, zones so the whole plaza never sprays at once, and a cabinet in a sheltered position.

Results

Guests stay longer outdoors and no standing water was observed. Temperature figures require measured data, which this project did not release, so we keep the description qualitative.

Related products

This page explains the configuration approach for a similar scenario; it is not a commitment to a specific outcome. Actual results depend on area, ventilation, water quality, nozzle selection and running hours, and are subject to a site survey and the signed contract.

Discuss a similar project Get a proposal

Send the scene and the area, then we talk equipment

We size the misting units, zones and nozzles to your area, install conditions and water/power supply.

Contact Get a proposal